Factories, mills and businesses
Cut the daytime load that costs you most.
For a factory or a mill, electricity is a line on the cost sheet. A three-phase rooftop system offsets daytime consumption, cuts the running cost of production and steadies your exposure to tariff changes.
100 kW to 1 MWTypical plant
- 1500 V
- Max system voltage
- 648 W
- Peak with bifacial gain
- 15 yr
- Product warranty
What you get
Built for this kind of site.
- Offsets consumption during your most expensive hours
- Three-phase systems engineered for industrial supply
- 1500 V system voltage keeps string counts and cabling down
- Dual glass construction suits a long roof life
- Serial-level traceability across the whole array
Commercial systems are sized from a load study and built to a single-line diagram. A 500 kW rooftop is roughly 855 modules and about 2,250 square metres of roof.
How a project runs
From first visit to handover.
- 01
Load study
We review twelve months of billing and log the load profile across a working cycle.
- 02
Engineering
Array layout, string design, single-line diagram and structural check of the roof.
- 03
Build
Phased installation planned around production so the plant keeps running.
- 04
Monitoring and O&M
Remote monitoring, scheduled cleaning and an agreed response time for faults.
Worth knowing
Questions we get asked.
- Will installation stop production?
- It should not. Rooftop work is normally phased and the final grid tie-in is scheduled for a planned shutdown window.
- Can the roof take the weight?
- Each module is 31.5 kg plus mounting. We check the structure during survey before any design is finalised.
- What about wind and snow load?
- The module is certified to 2400 Pa wind and 5400 Pa snow load when clamp mounted.
Tell us about your site.
Send your location, your load and what you want to run. We will size a system and come back with a written quote.